contact us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.​


Herne Bay, England, CT6
United Kingdom

Community website for all things Herne Bay (Kent, UK). Covers: The Downs, Herne Bay Museum, Herne Bay Historical Records Society, Herne Bay Pier Trust, Herne Bay in Bloom, East Cliff Neighbourhood Panel, No Night Flights, Manston Airport, Save Hillborough, Kitewood, WEA, Local Plan and much, much more...

HBM

Aldi: Down to earth with a bump?

HBM

Pottering about in Herne Bay this morning, I happened upon an odd contraption in the King's Road car park. This is the site of the future Aldi supermarket, which is described as being Phase 1 of the long-stalled regeneration plan for Herne Bay known as the "Central Development Area".

My insatiable curiosity got the better of me, and I had a chat to one of the men peering at the machine - a soil sampler which drives hollow tubes into the ground to find out what it's made of.

He turned out to be the recently appointed Development and Build Manager (something like that) for the Aldi construction project. He told me that this kind of building is usually built on concrete foundations (simple and quick), or is perched on top of piles driven into the ground (more expensive).

Apparently using driven piles would be more expensive than Aldi wants to pay, so he was looking into the feasibility of concrete foundations. This explains why Aldi hasn't yet submitted a planning application. Aldi wants to make sure the building is buildable at an affordable cost before going through the time and expense of the planning process.

While I was there, they finished drilling the first of the 15 or 20 holes they were planning to make across the car park. They had gone down 5 metres before hitting a concrete slab, which he assumed was probably something to do with the old gas works that used to be on the site.

The man said that other parts of the car park may have "only" 2 metres of sloppy clay covering the required "sound ground" - there's no telling without drilling. But as he pointed out, the deeper the holes are, the more soil has to be removed, and the more concrete has to be poured.

If it's 5 metres all over, that would be what he described as "a very big hole" - I love jargon. And, crucially, it would be as expensive (or more so) than driven piles. Which Aldi regards as too expensive. The Build Manager told me that the outcome of the drilling would decide whether the build happens at all.

So after all these years of waiting, it's still not certain that Phase 1 will go ahead. If the nature of the ground means that building anything the size of a supermarket is prohibitively expensive, then that will apply equally to any brand of supermarket, and any building of that scale.

I hope the Herne Bay Regeneration Team has a Plan B. They've had long enough to think of one, surely.


Herne Bay Matters home page

This is Brilliant!

HBM

Have a look at http://uk.votematch.eu/

As it says:

"Vote Match is a short quiz which aims to help you find the party that best reflects your political views in the 2014 European elections".

Quick, easy and useful - what more could you ask for?

Whatever party it tells you is the best match for you, PLEASE vote in the election. It's your right, and it makes a difference.


Herne Bay Matters home page

MOD Shoeburyness - Forthcoming Activity Alert: 24 April - 2 May 2014

contactCDCD@gmail.com

Detailed below is advance notification of activities which may be noticed in your neighbourhood. All of the limitations and stipulations outlined below apply.

*Date *

Reason for Notification

24, 29 April 2014

Gunfire and Explosions may be noticed.

25, 28, 30 April & 2 May 2014

Explosions may be noticed.

1 May 2014

Explosions may be noticed earlier than usual, 08:00.

Note:

Local Gunfire = Gunfire that is likely to be noticed only by communities close to MOD Shoeburyness.

Gunfire = Gunfire that may be noticed by communities in the vicinity of the Thames Estuary.

Explosions = Explosions that may be noticed by communities in the vicinity of the Thames Estuary.

MOD SHOEBURYNESS WEBSITE

This information was correct at the time of publishing. The most accurate and up to date information can be found on the MOD Shoeburyness website at www.shoeburyness.qinetiq.com, why not visit and save it to your favourites for quick access.

I hope that you find this information useful. Please feel free to pass it on to your neighbours.


Herne Bay Matters home page

WEA Summer program

HBM

An excellent line-up for the summer - perfect for the Garden of England!

Hurry to book your places - contact details below.


LITERATURE

Poetry of Seasons and Gardens

Tutor: Ron Dodge - 10-week course

Green thoughts in green shades or seasons of mist and mellow fruitfulness. We have these and other less well known but fine poetry in this course.

Thursdays 10 am – 12 noon from 24.04.2014, fee £79.00

Meeting in North Room, Christ Church, William St. Herne Bay, CT6 5NR.


LOCAL HISTORY

Kentish Men and Men of Kent

Tutor: Deborah Cole - 5-week course

We will look at archaeology, place names, literature, places and connections, administrative areas and new research in linguistics and genetics. Does a pattern emerge of cultural regions, and what about their origins?

Tuesdays 2.00 - 4.00 pm, from 22.04.2014, fee £39.50

Meeting in Beach House, Beach Street, Herne Bay, Kent CT6 5PT


GARDENS

The Story of the English Garden

Tutor: Sally Berkeley - 5-week course    

The English Garden has evolved over two millennia. What did various invaders – Romans, Anglo-Saxons and Normans – bring to our gardens?

Thursdays – 2.00 to 4.00 pm, from 24.04.2014, fee £39.50

Meeting in Beach House, Beach Street, Herne Bay, Kent CT6 5PT


For further information or to book a place on a course please contact:

Graham Woolnough - 01843 822971 - HerneBayWEA@gmail.com


Herne Bay Matters home page

John Gilbey's blueprint for Herne Bay

HBM

The Leader of our Council has produced a blueprint for debate. As he says:

Cllr John Gilbey

Cllr John Gilbey

As a member of the City Council for 11 years and as Portfolio Holder for Regeneration for 9 years, I have had a unique insight into many issues across the District and the County.

I don’t have all the answers to questions that are asked and would never make such a claim, but I would like to use my years of accumulated knowledge to present my ideas for the future of the Canterbury District.

This is not a plan, or a proposal, these are merely my own personal thoughts, a blueprint to encourage meaningful debate on these issues. This is a document to encourage you to write to me with your views and opinions, to stimulate positive ideas on the ways forward for all of us.

After a little chat about how in love with the Local Plan he is, and how we will all be living in "garden towns", basking in the glow of "sustainable urban design", Cllr Gilbey goes on to focus on specific areas.

Here's what he has to say about Herne Bay [with my comments] - do feel free to add your own comments below.


Herne Bay

The council will complete the town centre upgrade [after how many years, while you were portfolio holder for regeneration?] including moving the market and preserving some of the buildings currently in a state of decay [examples?]. There is a need to re-open some disused buildings and homes [examples?], and tax second homes appropriately [why, how, and how much?].

A proposal to open up Beach Street and rejuvenate that environment will also be completed [completed? has planning been approved?] as part of the upgrading of the town and in that context the sea front itself should be the subject of renewal/upgrading with analysis and decisions to be taken in the light of local views and aspirations [NO! it should be DRIVEN by local views and aspirations] on the future purpose of such an attractive location. We should widen the appeal and facilities of Herne Bay even further to encourage both tourism and business to provide local jobs.

We will have a solid foundation for a greater marketable attraction with all these planned developments. I strongly believe we should also support the Pier head activities [I think you mean the Pier stub - your Council has long since admitted it has no intention of rebuilding to the Pier head], satisfactorily resolve the future of the Museum [after YOUR Council cut its opening hours, following YEARS of neglect] and continue protection for the Downs [your Council is the ONLY objector to the village green application - village green status is the greatest possible protection under English law]. King's Hall needs to be fully supported in its endeavours to become a self supporting venue for events while providing community facilities. The replacement of the Beach Huts at the base of the Downs should also be part of the package [NEVER!].

The Roman fort remains at Reculver need to be enhanced and protected. The general environment of the coast at Reculver needs firm and direct action to provide an environment worthy of the history, nature, culture and attraction of this unique area [yes, it could be a great place for a caravan site...]. Overall Herne Bay should strive to be a modern vibrant town that provides attractions and facilities for residents and tourists, both taking advantage of the seaside location. The Bends should always be protected as a valuable green gap and open space.

This council has, over the last 9 years made huge progress in Herne Bay and this is often forgotten about. We have renovated the clock tower (with the recent announcement there is much more renovation to come) [so how good was your first renovation?] and sea front flood defences [er, no - this was Environment Agency funded], we have enhanced the whole concept and environment of Memorial Park, designated large Queen Elizabeth II Fields which permanently protects green open spaces from development [it affords no such protection - QEII land can be developed on, if a matching area nearby is provided as a replacement - in contrast, a village green can NOT be developed, which is why the Council is objecting], upgraded the Leisure Centre facilities and cleared the pier head [knocked down a building which had become unsafe through Council neglect, and put down a poor tarmac surface]. We have built a sports centre at Herne Bay High School incorporating a roller hockey rink while also encouraging and supporting local involvement throughout. We have prepared an Area Action Plan for the Town Centre and work is now underway. With residents there is much to be done still to preserve and enhance the ambiance and economic well being of the Town but we are well on our way.


Herne Bay Matters home page


All original material copyright © 2010-2014 HerneBayMatters.com All rights reserved. All external links disclaimed.